CHAPTER 2
Operation
System Power Up
NOTE: For proper power supply loading, at least two circuit cards should be installed in the frame before turning on the
power supplies.
1. Place the AC switches on the back of the ADAM CS Frame in the ON position.
The AC fans should turn on.
2. Place the ALARM OVERRIDE switch on the front panel in the center position.
3. Place the on/off switch on the front of each power supply in the ON position.
The POWER indicators and all the voltage indicators should be lit.
While the intercom system is initializing, the red fail indicators will be lit on all circuit cards. Allow 15 to 30 seconds for all
fail indicators to turn off.
NOTE: If the system fails to initialize, make sure that all circuit cards, especially the cards in slots 4 and 5, are properly seated.
Alarm Operation
If there is a power supply fault during operation, an audible alarm will sound and one or more indicator lights on the affected
power supply will turn off. To deactivate the alarm, set the ALARM OVERRIDE switch to the position for the affected supply.
Turn off the defective supply, and repair or replace it as soon as possible to ensure continued backup protection in the event of
another power supply failute.
NOTE: The power supply alarm will also sound if a power supply is not turned on. This is normal. Either turn on the power
supply, or set the ALARM OVERRIDE switch.
Computer Connection
Connect from J900 on the ADAM CS Frame to COM1 or COM2of the configuration PC (the default for AZedit is COM1).
The interconnect cable is null modem cable, the wiring is shown in Figure 3 on page 13.